Chongqing Light Rail Line opened tomorrow, the line length of 17.5 km
yesterday, the first trains light rail Line driver appearance: Zhang and Huang Yalan Mi. They are the second line from the light rail when it opened as the driver, has 6 years of driving experience.
Chongqing Morning News (chief reporter James source) Line light rail opened to traffic tomorrow, many people are looking forward to the third line to sit the first light rail train trip, some people hope that tomorrow we must feel the light rail Line, when the issue first bus?
Yesterday, the news from the Urban Rail Group, the third line’s first light rail train tomorrow at 2 pm from the intersection of the two stations and duck origin. Morning to remind you of two things: 29 am the third line there is no light rail train operations; the first day of operation, go to experience a lot of people may be, if you do not want to fight squeeze, do not sit tomorrow.
Light Rail Line from the North Zone duck, after the steam Bo center, to North train station, after a new wheel arch, to Guanyinqiao, Huaxin Street from the river to the two junctions, the line length 17.5 km, on the ground and underground trains have four sections, described as “heaven into the earth.” Because a large number of ground segment, in particular, to leap the Jialing River, the landscape in terms of light rail Line is very interesting, this and the underground Metro line was different.
Light Rail Line to the intersection of the two duck section entire running time of about 29 minutes, the sites are: the two junctions, Niujiaotuo, Huaxin Street, Guanyinqiao, red ditches, Chia-Chou Road, Cheng yard, Tang yard, Shiziping, Chongqing North Station, leading Temple, Tong yard, Kim Yu, golden boy way, duck. Among them, the red ditches, Cheng yard, leading Temple and child yard temporarily opened, is expected to open during the year.
reminder, this temple is not the leading North train station, you go to the North Railway Station in the “Chongqing North Station”. Chongqing North Railway Station, trains and light rail Line, coach transfer to Zero: Light Rail Line 2, Chongqing North Station North Exit the train station ticket office door, Exit 3 on the train out of North Station concourse , Exit 1 at the head of Temple transit hub, leading through the transit hub to reach the Temple coach station.
Light Rail Line trains every eight minutes for a train tomorrow’s opening hours are 14:00-20:30 income classes, beginning the day after tomorrow is the opening time of collection classes 7:30-20:30.
to share: welcome comments I want to comment
microblogging Recommended | today microblogging hot (edit: SN028)