Ningxia section of the Yellow River flood peak has abate the flood was still
Yellow River
Zhongguang Wang Yinchuan, August 3 (ZHENG Ying Reporter) This reporter learned from the Ningxia the Playback ethnic autonomous regions and Flood Control and Drought Relief Headquarters Office Today 14:00 Shizuishan Hydrometric Station flows 2460 cubic meters per second. Ningxia section of the Yellow River on the 1st peak reduction, the Yellow River water level or change, but the flood water is still large. Yellow River in Ningxia section of the 1st peak at 9pm on the 2nd Xushun Li Yellow River in Ningxia, the Yellow River in Inner Mongolia.
Ningxia Hydrology and Water Resources Survey Bureau data show that at 14:00 today, the hydrological stations of the Yellow River in Lanzhou to Shizuishan segment traffic were: Lanzhou hydrological stations measured flow of 2550 cubic meters per second, under the Riverside hydrological stations in Ningxia measured flow of 2530 cubic meters per second the Qingtongxia hydrological stations measured flow of 1880 cubic meters per second, the Shizuishan hydrological stations measured flow of 2460 cubic meters per second. Flow integrated into the yellow, tributary of the Yellow River and the Yellow River Irrigation main drainage gangou of 114.2 cubic meters per second, up a daily average flow reduction of 25.1 cubic meters per second. Yellow River Irrigation diversion a total of 245 cubic meters per second, an increase of 52 cubic meters per second yesterday. Yellow River flood peak reduction, the water level had no significant or change, but the flood water is still, for the maximum since 1989.
, flood control departments at all levels remains operational readiness in the event of danger, Qiang Hu in a timely manner, to ensure the safety of standardization embankment, to ensure the safety of personnel, minimize property damage.
welcome to leave a comment share: the microblogging recommended