Sunshine Lake, Kaifeng, Henan, filling the building of nearly 4,000 square parties detained
The
newly built villa
■ It is learned that the sun was to fill Lake is an important part of the three works of Kaifeng River
■ According to statistics , filling the building to build a nearly 4,000 square meters, a parties has XingJu the
□ chief reporter Zhou Bin intern Xu Fang Fangwen
core Tips
the sun located in the Kaifeng urban northeastern corner of the Lake Bao Lake, Dragon Pavilion Lake, Tower Lake, Kaifeng “an important part of the river system. Important connection point between Kaifeng City water system to be implemented three projects Bao Lake and Tower Lake. Recently, many people told this newspaper reflect the sun lake on the 8th pool was with soil filled and built over 3900 square meters of buildings.
1
the
dry lake “face” on the built villas
yesterday morning. The reporters came to the sun lake sites along the of Kaifeng east walls Cao door. “Site” because here the original 400 acres of sparkling, lush grass lake, now dry bottomed out.
Sunshine East Lake from the east wall of Kaifeng, the west within the Ring Road, the north section (formerly the Huiji Hebei section of the east coast), south from the old campus of Sunshine Street North, north to Henan University, Ming Lun Street, South . The 1970s, the original Kaifeng City aquaculture fish here, but also the lake to build a few ridge slice management, when the sun lake fish groups.
in the decades that followed, the unit operating by the individual contracting, the lake is also surrounded by gradually eroded to the lake and piles of refuse. The original 400 acres of lake, and today has basically dried up, could not find “lake” looks like.
The Sunshine Lake as an important connection point of the three works of Kaifeng City water system is expected to resume its original splendor, at this time has been filling the lake and construction of buildings will be gradually eroded. “A reflection of the situation of the public says with emotion.
along the walls, reporters in the sun lake’s northeast corner to find a locked door, two-story wall, there is less than the inside. The reporter boarded the 6th floor of the nearby residential buildings, through the window and saw the yard strewn with bricks, sand. The west, three two-story, the most southern of an external wall has been posted tiles; the east is a two-storey and two bungalows; further north is a row of two-tier buildings, a row of buildings north side that is, on the 8th of Sunshine Lake pool.
2
filling the lake to build a house four years ago started
reporters came to Kaifeng the Shunhe Hui District Construction Bureau to understand the situation, the council person in charge, after they received a report from the masses, has conducted a survey on the matter. The building is sun lake fisheries, the original Kaifeng City Commercial Bureau aquaculture company responsible person Jiamou arrested for the crime of illegal business, he has been under criminal detention.
Construction Bureau staff told reporters that by aquaculture companies in Kaifeng City the Jiamou in 2005 (now renamed the consent of the Kaifeng City, river and lake cleaning company) built a fence around the pool, sun lake on the 8th closed management, hospital by Jiamou responsible for routine maintenance.
in 2008, Kaifeng City Construction Committee approved the Kaifeng City aquaculture company can build two temporary garage approved area of ??84 m2 and 63 m2, but Jiamou actually built the building area of ??543 square meters, 308 square meters, and does not use as a garage, but for six residents living
At that time, this place is much higher than the approval area of ??illegal construction and not subject to the relevant department for investigation.
3
lake house built nearly 4000 square meters
along River District Construction Bureau of Investigation, pool existing hospital building, sun lake on the 8th 10, a total of 3965 square meters. Including construction of two ultra-approval area in 2008 “garage”, Kaifeng City, rivers and lakes Procter & Gamble contributed to the building in 2008, and since the two buildings, Jiamou self-built two-story building, a janitor’s room and two bungalows, as well as the reporter observed four two-story building. Four two-story building is a private villa, according to the purchase agreement provided by the villa owner, to sell them the house is Jiamou.
insiders told reporters, the Kaifeng River Phase 3 will be the demolition stage, pool location, sun lake on the 8th is the demolition of the scope of the development. Building or buy a house here, one important reason is to obtain high relocation compensation.
Kaifeng City in progress ‘two change the one built’ work around the lake and within the jurisdiction of illegal building a comprehensive renovation of households to buy a house from Jiamou hands after learning of the situation, holding came to the Construction Bureau of the purchase agreement, the legal procedures for their own housing. “construction bureau, told reporters here housing both a planning permit, no building permit is illegal construction. we have this matter submitted to the District government, has yet to come up with specific treatment options. “
share: Welcome to the comment I want to comment Bo the micro Recommend | today microblogging hot